Circuito BPER104SAP

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación D D D D D D D D D D D D
Clientes 2423 2423 2435 4998 5013 4976 5008 5006 4933 4995 4959 4938
% Nivel Cobranza 0.00% 80.52% 84.48% 85.57% 100.49% 84.09% 90.22% 96.64% 95.74% 99.71% 90.72% 88.68%
% Nivel Pérdida 0.00% 59.30% 82.21% 62.13% 65.28% 57.81% 61.01% 65.88% 64.05% 64.96% 63.80% 53.65%
Energía Suministrada (GWh) 0 1.35 3.1 2.7 2.72 2.41 2.69 2.82 2.83 3.06 3.15 3.31
Energía Facturada (GWh) 0 0.55 0.55 1.02 0.95 1.02 1.05 0.96 1.02 1.07 1.14 1.53
Energía Cobrada (GWh) 0 0.44 0.47 0.88 0.95 0.85 0.95 0.93 0.97 1.07 1.03 1.36
% Servicio 94.92% 95.63% 93.78% 93.77% 98.91% 97.49% 99.27% 97.39% 97.47% 97.52% 96.17% 96.42%
% Sin Servicio 5.08% 4.37% 6.22% 6.23% 1.09% 2.51% 0.73% 2.61% 2.53% 2.48% 3.83% 3.58%
Interrupción Programada (Hrs) 60.00 65.00 52.00 43.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 18.00
Interrupción Ejecutada (Hrs) 36.56 31.44 44.79 44.85 7.86 18.05 5.28 19.41 18.46 18.09 27.95 26.12
Promedio Interrupción Diarias (Hrs) 1.20 1.03 1.47 1.47 0.26 0.59 0.17 0.64 0.61 0.59 0.92 0.86
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito BPER104SAP
Interrupciones Programadas 15
Interrupciones Ejecutadas 25.22
% Ejecución Operativa 168.13%
Detalle de Salidas - Circuito BPER104SAP
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Programada 09:00:00 14:00:00 5 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
20/08/2026 Ejecutada 09:08:17 13:59:34 5.71 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
20/08/2026 Ejecutada 04:05:10 04:14:32 5.71 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
20/08/2026 Ejecutada 00:30:25 01:07:00 5.71 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
20/08/2026 Ejecutada 00:21:41 00:26:55 5.71 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
19/08/2026 Ejecutada 09:58:38 10:02:25 0.06 DISPARO DESCONOCIDO
18/08/2026 Programada 08:00:00 13:00:00 5 INTERCONEXION DE PROYECTOS
18/08/2026 Ejecutada 18:49:14 19:02:41 0.22 INTERCONEXION DE PROYECTOS
15/08/2026 Ejecutada 18:40:01 18:49:17 0.58 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
15/08/2026 Ejecutada 11:37:44 11:52:18 0.58 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
15/08/2026 Ejecutada 10:35:13 10:45:55 0.58 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
14/08/2026 Programada 13:00:00 18:00:00 5
13/08/2026 Ejecutada 21:04:24 21:10:29 0.18 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
13/08/2026 Ejecutada 15:38:42 15:43:23 0.18 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
Sabana del Puerto, Jayaco, La Recta, El Abanico, Callejon El Puerton, San Isidro, Caño Piedra, Jima de Bonao, Callejon de Mallia, Callejon La Copla, Carretera Peñalo y Fula.