Circuito BPER104

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C C C C C C C C C C
Clientes 2465 2425 1678 1678 1692 1681 1679 1675 1732 1653 1653 1643
% Nivel Cobranza 0.00% 88.56% 99.71% 90.06% 92.72% 101.25% 106.21% 92.66% 92.92% 113.19% 0.43% 102.68%
% Nivel Pérdida 0.00% 26.31% 37.21% 33.52% 39.86% 29.79% 39.17% 31.33% 40.95% 44.81% 21.83% 42.66%
Energía Suministrada (GWh) 0 2.34 2.19 2.1 2.09 1.88 1.99 1.83 2.27 2.33 1.84 2.49
Energía Facturada (GWh) 0 1.72 1.38 1.4 1.26 1.32 1.21 1.25 1.34 1.29 1.44 1.43
Energía Cobrada (GWh) 0 1.53 1.37 1.26 1.17 1.34 1.29 1.16 1.25 1.45 0.01 1.47
% Servicio 99.36% 98.24% 98.05% 99.41% 99.81% 99.89% 99.04% 98.94% 97.95% 98.78% 96.35% 98.26%
% Sin Servicio 0.64% 1.76% 1.95% 0.59% 0.19% 0.11% 0.96% 1.06% 2.05% 1.22% 3.65% 1.74%
Interrupción Programada (Hrs) 0.00 0.00 9.00 12.00 0.00 0.00 0.00 0.00 25.00 8.00 32.00 13.00
Interrupción Ejecutada (Hrs) 4.70 12.82 14.26 4.28 1.39 0.80 6.98 7.71 14.96 8.90 26.66 12.70
Promedio Interrupción Diarias (Hrs) 0.15 0.42 0.47 0.14 0.05 0.03 0.23 0.25 0.49 0.29 0.88 0.42
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Clientes Exclusivo Calle Duarte Parcial, Calle DR. Gautier, Avenida Circunvalacion Parcial, CalleMaría Trinidad Sánchez, Calle Avenida Libertad, Banco Banreserva, La Sirena, Cabaña Hermes, la UASD, CalleJose Lino Abreu hacia la Vega Parcial, Hospital Marchena, Instituto de Especialidades Medicas Monseñor Nouel, Polibon, Avenida las Hortensias, Las Delicias, Los Quemados parcial, Grupo Valerio, Plaza Jacaranda, Autopista Duarte hacia la Vega Parcial.