Buscar Circuitos Glosario

Circuito BONP101

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación C C C C C C C C C C C C
Clientes 4815 4815 4802 4802 4771 4805 4760 4783 4776 4793 4729 4959
% Nivel Cobranza 0.00% 80.01% 84.09% 83.77% 103.92% 85.16% 95.66% 101.34% 101.20% 102.35% 90.35% 88.70%
% Nivel Pérdida 0.00% 47.55% 49.63% 44.38% 48.34% 37.20% 45.31% 47.52% 45.85% 45.92% 44.81% 49.44%
Energía Suministrada (GWh) 0 2.69 2.43 2 1.98 1.79 1.97 2.08 2.14 2.37 2.55 2.84
Energía Facturada (GWh) 0 1.41 1.22 1.11 1.02 1.12 1.08 1.09 1.16 1.28 1.41 1.43
Energía Cobrada (GWh) 0 1.13 1.03 0.93 1.06 0.96 1.03 1.11 1.17 1.31 1.27 1.27
% Servicio 99.66% 99.54% 99.39% 99.38% 99.99% 99.28% 100.00% 100.00% 99.37% 99.61% 99.57% 99.21%
% Sin Servicio 0.34% 0.46% 0.61% 0.62% 0.01% 0.72% 0.00% 0.00% 0.63% 0.39% 0.43% 0.79%
Interrupción Programada (Hrs) 0.00 0.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00
Interrupción Ejecutada (Hrs) 2.46 3.28 4.41 4.45 0.07 5.15 0.00 0.00 4.63 2.85 3.13 5.74
Promedio Interrupción Diarias (Hrs) 0.08 0.11 0.14 0.15 0.00 0.17 0.00 0.00 0.15 0.09 0.10 0.19
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito BONP101
Interrupciones Programadas 11
Interrupciones Ejecutadas 10.75
% Ejecución Operativa 97.73%
Detalle de Salidas - Circuito BONP101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
11/08/2026 Programada 10:00:00 16:00:00 6 INTERCONEXION DE PROYECTOS
11/08/2026 Ejecutada 11:25:43 16:45:03 5.32 INTERCONEXION DE PROYECTOS
04/08/2026 Programada 13:00:00 18:00:00 5 INTERCONEXION DE PROYECTOS
04/08/2026 Ejecutada 13:13:38 18:39:09 5.43 INTERCONEXION DE PROYECTOS
Centro de la ciudad (desde la Calle Padre Fantino hasta calle Las Mercedes).