Buscar Circuitos Glosario

Circuito BONP101

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 4832 4832 4815 4815 4802 4802 4771 4805 4760 4783 4776 4793
% Nivel Cobranza 0.00% 84.54% 90.55% 80.01% 84.09% 83.77% 103.92% 85.16% 95.66% 101.34% 101.20% 102.35%
% Nivel Pérdida 0.00% 44.79% 48.50% 47.55% 49.63% 44.38% 48.34% 37.20% 45.31% 47.52% 45.85% 45.92%
Energía Suministrada (GWh) 0 2.91 2.85 2.69 2.43 2 1.98 1.79 1.97 2.08 2.14 2.37
Energía Facturada (GWh) 0 1.61 1.47 1.41 1.22 1.11 1.02 1.12 1.08 1.09 1.16 1.28
Energía Cobrada (GWh) 0 1.36 1.33 1.13 1.03 0.93 1.06 0.96 1.03 1.11 1.17 1.31
% Servicio 100.00% 98.51% 99.66% 99.54% 99.39% 99.38% 99.99% 99.28% 100.00% 100.00% 99.37% 99.61%
% Sin Servicio 0.00% 1.49% 0.34% 0.46% 0.61% 0.62% 0.01% 0.72% 0.00% 0.00% 0.63% 0.39%
Interrupción Programada (Hrs) 0.00 11.00 0.00 0.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 10.75 2.46 3.28 4.41 4.45 0.07 5.15 0.00 0.00 4.63 2.85
Promedio Interrupción Diarias (Hrs) 0.00 0.35 0.08 0.11 0.14 0.15 0.00 0.17 0.00 0.00 0.15 0.09
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito BONP101
Interrupciones Programadas 6
Interrupciones Ejecutadas 5.89
% Ejecución Operativa 98.17%
Detalle de Salidas - Circuito BONP101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Programada 08:00:00 11:00:00 3 APERTURA DE LINEA DE TRANSMISION
20/10/2026 Ejecutada 07:29:47 13:23:02 5.89 APERTURA DE LINEA DE TRANSMISION
13/10/2026 Programada 08:00:00 11:00:00 3
Centro de la ciudad (desde la Calle Padre Fantino hasta calle Las Mercedes).