Buscar Circuitos Glosario

Circuito BOCA02

Distribuidora EdeEste - Provincia Santo Domingo


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 5103 5103 5142 5102 5107 5132 5110 5156 5215 5225 5196 5302
% Nivel Cobranza 0.00% 85.81% 87.54% 100.31% 96.26% 100.06% 70.73% 93.77% 97.45% 105.15% 89.97% 98.63%
% Nivel Pérdida 0.00% 72.81% 70.90% 68.01% 65.95% 64.24% 62.90% 65.83% 69.29% 70.41% 71.52% 65.26%
Energía Suministrada (GWh) 0 6.66 5.65 4.89 4.47 4.75 4.96 5.53 6.34 6.05 7.59 5.86
Energía Facturada (GWh) 0 1.81 1.64 1.56 1.52 1.70 1.84 1.89 1.95 1.79 2.16 2.04
Energía Cobrada (GWh) 0 1.55 1.44 1.57 1.46 1.7 1.30 1.77 1.90 1.88 1.94 2.01
% Servicio 90.20% 94.97% 95.50% 97.28% 98.17% 95.60% 99.02% 94.98% 96.76% 96.31% 95.98% 96.75%
% Sin Servicio 9.80% 5.03% 4.50% 2.72% 1.83% 4.40% 0.98% 5.02% 3.24% 3.69% 4.02% 3.25%
Interrupción Programada (Hrs) 25.00 30.00 54.00 60.00 42.00 36.00 19.00 8.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 70.58 36.20 32.37 19.60 13.15 31.67 7.28 36.63 23.67 26.97 29.33 23.73
Promedio Interrupción Diarias (Hrs) 2.32 1.19 1.06 0.64 0.43 1.04 0.24 1.20 0.78 0.89 0.96 0.78
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito BOCA02
Interrupciones Programadas 18.00
Interrupciones Ejecutadas 20.14
% Ejecución Operativa 111.89%
Detalle de Salidas - Circuito BOCA02
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Programada 08:20:00 11:20:00 3.00 SS/EE (SALIDA FORZADA) - SOBRECARGA TRAFO // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
07/07/2026 Ejecutada 17:56:00 18:06:00 0.98 SS/EE (SALIDA FORZADA) - SOBRECARGA TRAFO // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
07/07/2026 Ejecutada 16:46:00 17:35:00 0.98 SS/EE (SALIDA FORZADA) - SOBRECARGA TRAFO // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
04/07/2026 Programada 06:20:00 09:20:00 3.00 TRANSMISION - FACILITAR TRABAJOS TRANSMISION
04/07/2026 Ejecutada 07:02:00 14:50:00 7.80 TRANSMISION - FACILITAR TRABAJOS TRANSMISION
03/07/2026 Ejecutada 11:26:00 12:43:00 1.28 DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR
02/07/2026 Programada 09:20:00 15:20:00 6.00 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
02/07/2026 Ejecutada 09:03:00 17:27:00 8.40 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
30/06/2026 Programada 09:20:00 15:20:00 6.00 SS/EE (DISPARO AVERIA) - DISPARO TRANSF. POTENCIA LADO BT // DISTRIBUCION (FACILIDADES OPERATIVAS) - PARA FACILITAR TRABAJOS A OTRO CTO
30/06/2026 Ejecutada 21:04:00 21:17:00 0.35 SS/EE (DISPARO AVERIA) - DISPARO TRANSF. POTENCIA LADO BT // DISTRIBUCION (FACILIDADES OPERATIVAS) - PARA FACILITAR TRABAJOS A OTRO CTO
30/06/2026 Ejecutada 11:19:00 11:27:00 0.35 SS/EE (DISPARO AVERIA) - DISPARO TRANSF. POTENCIA LADO BT // DISTRIBUCION (FACILIDADES OPERATIVAS) - PARA FACILITAR TRABAJOS A OTRO CTO
ANDRES, BATEY ANDRES, COSTA BLANCA, EL BRISAL (BRISAS CAUCEDO), EL HIGO, JERUSALEN, LOS UNIDOS-LA CALETA, MARIA ESTELA, MIRAMAR I, RESIDENCIAL PANAMERICANO, SAN ANDRES COUNTRY CLUB, TANQUESITOS.