Circuito BENE01

Distribuidora EdeEste - Provincia La Altagracia


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 830 835 834 834 829 832 826 832 830 831 827 839
% Nivel Cobranza 77.00% 76.42% 69.23% 80.63% 66.53% 70.82% 98.24% 79.05% 81.89% 67.93% 67.80% 76.59%
% Nivel Pérdida 60.85% 58.67% 60.33% 60.25% 57.48% 60.14% 58.74% 54.70% 57.14% 56.29% 60.94% 60.58%
Energía Suministrada (GWh) 1.06 1.10 1.13 0.97 0.94 0.85 0.80 0.66 0.75 0.80 0.79 0.85
Energía Facturada (GWh) 0.42 0.46 0.45 0.39 0.40 0.34 0.33 0.30 0.32 0.35 0.31 0.34
Energía Cobrada (GWh) 0.32 0.35 0.31 0.31 0.26 0.24 0.32 0.24 0.26 0.24 0.21 0.26
% Servicio 99.93% 99.62% 99.97% 97.16% 99.58% 100.00% 99.66% 99.97% 99.35% 99.23% 99.92% 98.88%
% Sin Servicio 0.07% 0.38% 0.03% 2.84% 0.42% 0.00% 0.34% 0.03% 0.65% 0.77% 0.08% 1.12%
Interrupción Programada (Hrs) 0.00 0.00 0.00 6.00 18.00 6.00 0.00 24.00 12.00 6.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.53 2.77 0.25 20.48 3.05 0.00 2.48 0.22 4.70 5.73 0.58 8.17
Promedio Interrupción Diarias (Hrs) 0.02 0.09 0.01 0.67 0.10 0.00 0.08 0.01 0.15 0.19 0.02 0.27
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito BENE01
Interrupciones Programadas 0
Interrupciones Ejecutadas 18.48
% Ejecución Operativa 0%
Detalle de Salidas - Circuito BENE01
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
14/10/2026 Ejecutada 08:42:00 08:49:00 0.12 DISTRIBUCION (DISPARO/AVERIAS) - FALLA DE COMUNICACION DEL EQUIPO
07/10/2026 Ejecutada 17:42:00 21:55:00 9.18 DISTRIBUCION (DISPARO/AVERIAS) - LLUVIAS // SS/EE (DISPARO AVERIA) - FALLOS EN INTERRUPTOR S/E
07/10/2026 Ejecutada 09:52:00 14:50:00 9.18 DISTRIBUCION (DISPARO/AVERIAS) - LLUVIAS // SS/EE (DISPARO AVERIA) - FALLOS EN INTERRUPTOR S/E
BARRIO GIL, BATEY EL JUNCO, BATEY LAS CEJAS, BENERIT0, SANTA CRUZ DE GATO, VILLA PADRE NUESTRO.