Circuito BAYO102
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D | D | D | D | A | D | D |
| Clientes | 8045 | 8045 | 10334 | 10282 | 10282 | 10209 | 10222 | 10122 | 10059 | 10041 | 13831 | 13837 |
| % Nivel Cobranza | 0.00% | 92.32% | 96.02% | 97.26% | 102.53% | 99.87% | 90.74% | 99.88% | 92.59% | 99.18% | 97.61% | 86.45% |
| % Nivel Pérdida | 0.00% | 42.23% | 44.03% | 43.68% | 43.93% | 43.03% | 45.20% | 53.40% | 51.16% | 45.00% | 52.98% | 42.87% |
| Energía Suministrada (GWh) | 0 | 3.51 | 3.69 | 4.02 | 4.12 | 4.61 | 4.99 | 5.3 | 4.84 | 4.41 | 6.23 | 5.35 |
| Energía Facturada (GWh) | 0 | 2.03 | 2.07 | 2.27 | 2.31 | 2.62 | 2.73 | 2.47 | 2.37 | 2.42 | 2.93 | 3.05 |
| Energía Cobrada (GWh) | 0 | 1.87 | 1.98 | 2.20 | 2.37 | 2.62 | 2.48 | 2.47 | 2.19 | 2.4 | 2.86 | 2.64 |
| % Servicio | 99.65% | 99.03% | 99.58% | 99.44% | 97.60% | 99.66% | 98.50% | 99.62% | 99.45% | 99.53% | 98.90% | 98.59% |
| % Sin Servicio | 0.35% | 0.97% | 0.42% | 0.56% | 2.40% | 0.34% | 1.50% | 0.38% | 0.55% | 0.47% | 1.10% | 1.41% |
| Interrupción Programada (Hrs) | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | 2.00 | 0.00 | 0.00 | 0.00 | 0.00 | 3.00 | 8.00 |
| Interrupción Ejecutada (Hrs) | 2.52 | 6.98 | 3.01 | 4.19 | 17.51 | 2.48 | 10.97 | 2.75 | 4.00 | 3.44 | 8.02 | 10.26 |
| Promedio Interrupción Diarias (Hrs) | 0.08 | 0.23 | 0.10 | 0.14 | 0.58 | 0.08 | 0.36 | 0.09 | 0.13 | 0.11 | 0.26 | 0.34 |
San Miguel, Bayona, Bella Colina, Bo. El Cielo de Bayona, Riviera de Haina, Urb. Antonia, Villa Nazaret, Villa Hilda, Resid. Arroyo Bonito, Resid. Pinos del Paraíso, Brisa Tropical, Hacienda Jimenez.