Circuito BAYO102
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 | Abr24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | D | D | A | A | A | A | A | A | A | A | A | A |
Clientes | 13875 | 9997 | 9946 | 9927 | 9942 | 10024 | 13862 | 13866 | 10872 | 10897 | 10928 | 10789 |
% Nivel Cobranza | 106.67% | 98.74% | 101.77% | 99.41% | 97.90% | 99.99% | 93.34% | 100.95% | 99.09% | 92.06% | 97.54% | 94.74% |
% Nivel Pérdida | 53.96% | 55.87% | 42.63% | 53.29% | 36.81% | 54.52% | 50.26% | 52.02% | 50.10% | 50.83% | 50.19% | 44.72% |
Energía Suministrada (GWh) | 5.76 | 4.41 | 3.56 | 4.44 | 3.72 | 5.29 | 6.64 | 6.82 | 6.51 | 6.38 | 6.06 | 5.35 |
Energía Facturada (GWh) | 2.65 | 1.95 | 2.04 | 2.07 | 2.35 | 2.4 | 3.3 | 3.27 | 3.25 | 3.14 | 3.02 | 2.96 |
Energía Cobrada (GWh) | 2.83 | 1.92 | 2.08 | 2.06 | 2.3 | 2.4 | 3.08 | 3.3 | 3.22 | 2.89 | 2.94 | 2.8 |
% Servicio | 99.57% | 95.85% | 91.75% | 99.71% | 97.74% | 98.63% | 98.58% | 96.23% | 98.76% | 99.74% | 98.41% | 99.44% |
% Sin Servicio | 0.43% | 4.15% | 8.25% | 0.29% | 2.26% | 1.37% | 1.42% | 3.77% | 1.24% | 0.26% | 1.59% | 0.56% |
Interrupción Programada (Hrs) | 4.00 | 26.00 | 40.00 | 3.00 | 3.00 | 3.00 | 6.00 | 0.00 | 0.00 | 0.00 | 0.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 3.11 | 30.32 | 60.22 | 2.13 | 16.51 | 9.97 | 10.34 | 27.54 | 9.04 | 1.91 | 11.59 | 4.11 |
Promedio Interrupción Diarias (Hrs) | 0.10 | 1.00 | 1.98 | 0.07 | 0.54 | 0.33 | 0.34 | 0.91 | 0.30 | 0.06 | 0.38 | 0.14 |
San Miguel, Bayona, Bella Colina, Bo. El Cielo de Bayona, Riviera de Haina, Urb. Antonia, Villa Nazaret, Villa Hilda, Resid. Arroyo Bonito, Resid. Pinos del Paraíso, Brisa Tropical, Hacienda Jimenez.