Circuito BANP102

Distribuidora EdeSur - Provincia Peravia


Mes-Año Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25
Clasificación D D D D D D D D D D A D
Clientes 4899 4899 4871 4869 4920 4920 4937 4908 4926 4858 4793 4759
% Nivel Cobranza 0.00% 89.81% 83.76% 87.96% 85.23% 88.90% 87.06% 76.03% 79.46% 94.59% 78.32% 81.48%
% Nivel Pérdida 0.00% 74.21% 71.89% 73.81% 74.49% 75.43% 73.53% 74.77% 77.64% 78.94% 77.32% 78.20%
Energía Suministrada (GWh) 0 3.96 3.56 3.88 4.12 4.08 4.36 4.7 4.83 4.75 4.39 4.39
Energía Facturada (GWh) 0 1.02 1 1.02 1.05 1.00 1.15 1.18 1.08 1 1 0.96
Energía Cobrada (GWh) 0 0.92 0.84 0.89 0.90 0.89 1.00 0.9 0.86 0.95 0.78 0.78
% Servicio 98.74% 97.06% 97.30% 98.33% 98.57% 97.42% 96.67% 96.79% 94.60% 97.28% 97.94% 97.31%
% Sin Servicio 1.26% 2.94% 2.70% 1.67% 1.43% 2.58% 3.33% 3.21% 5.40% 2.72% 2.06% 2.69%
Interrupción Programada (Hrs) 6.00 12.00 7.00 7.00 10.00 16.00 16.00 9.00 3.00 13.00 14.00 15.00
Interrupción Ejecutada (Hrs) 9.09 21.16 19.41 12.00 10.67 18.82 24.30 23.45 39.46 19.82 15.05 19.65
Promedio Interrupción Diarias (Hrs) 0.30 0.70 0.64 0.39 0.35 0.62 0.80 0.77 1.30 0.65 0.49 0.65
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Ciudad, Urb. Luz Marina, Bo. Pueblo Nuevo, Bo. Máximo Gomez, El Maní, La Montería, La Saona, Los Cajuilitos, El Fundo, Guazuma 2DA, Los Barracones, Villa Guera, La Montería, Pueblo Nuevo (parcial).