Circuito BANP102

Distribuidora EdeSur - Provincia Peravia


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación D D D D D A D D D D D A
Clientes 4937 4937 4908 4926 4858 4793 4759 4595 4409 4317 4268 4258
% Nivel Cobranza 0.00% 87.06% 76.03% 79.46% 94.59% 78.32% 81.48% 80.14% 87.89% 80.42% 82.32% 87.03%
% Nivel Pérdida 0.00% 73.53% 74.77% 77.64% 78.94% 77.32% 78.20% 78.14% 81.32% 77.73% 78.37% 80.82%
Energía Suministrada (GWh) 0 4.36 4.7 4.83 4.75 4.39 4.39 4 4.01 3.54 3.84 4.19
Energía Facturada (GWh) 0 1.15 1.18 1.08 1 1 0.96 0.88 0.75 0.79 0.83 0.8
Energía Cobrada (GWh) 0 1.00 0.9 0.86 0.95 0.78 0.78 0.7 0.66 0.63 0.68 0.7
% Servicio 97.42% 96.67% 96.79% 94.60% 97.28% 97.94% 97.31% 97.57% 94.27% 95.81% 91.69% 98.28%
% Sin Servicio 2.58% 3.33% 3.21% 5.40% 2.72% 2.06% 2.69% 2.43% 5.73% 4.19% 8.31% 1.72%
Interrupción Programada (Hrs) 16.00 16.00 9.00 3.00 13.00 14.00 15.00 12.00 10.00 28.00 46.00 11.00
Interrupción Ejecutada (Hrs) 18.82 24.30 23.45 39.46 19.82 15.05 19.65 17.71 41.83 30.58 60.63 12.58
Promedio Interrupción Diarias (Hrs) 0.62 0.80 0.77 1.30 0.65 0.49 0.65 0.58 1.38 1.01 1.99 0.41
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Ciudad, Urb. Luz Marina, Bo. Pueblo Nuevo, Bo. Máximo Gomez, El Maní, La Montería, La Saona, Los Cajuilitos, El Fundo, Guazuma 2DA, Los Barracones, Villa Guera, La Montería, Pueblo Nuevo (parcial).