Circuito BANP102

Distribuidora EdeSur - Provincia Peravia


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación D D D D D D D A D D D D
Clientes 4917 4920 4920 4937 4908 4926 4858 4793 4759 4595 4409 4317
% Nivel Cobranza 0.00% 0.00% 88.90% 87.06% 76.03% 79.46% 94.59% 78.32% 81.48% 80.14% 87.89% 80.42%
% Nivel Pérdida 0.00% 0.00% 75.43% 73.53% 74.77% 77.64% 78.94% 77.32% 78.20% 78.14% 81.32% 77.73%
Energía Suministrada (GWh) 0 0 4.08 4.36 4.7 4.83 4.75 4.39 4.39 4 4.01 3.54
Energía Facturada (GWh) 0 0 1.00 1.15 1.18 1.08 1 1 0.96 0.88 0.75 0.79
Energía Cobrada (GWh) 0 0 0.89 1.00 0.9 0.86 0.95 0.78 0.78 0.7 0.66 0.63
% Servicio 98.33% 98.57% 97.42% 96.67% 96.79% 94.60% 97.28% 97.94% 97.31% 97.57% 94.27% 95.81%
% Sin Servicio 1.67% 1.43% 2.58% 3.33% 3.21% 5.40% 2.72% 2.06% 2.69% 2.43% 5.73% 4.19%
Interrupción Programada (Hrs) 7.00 10.00 16.00 16.00 9.00 3.00 13.00 14.00 15.00 12.00 10.00 28.00
Interrupción Ejecutada (Hrs) 12.00 10.67 18.82 24.30 23.45 39.46 19.82 15.05 19.65 17.71 41.83 30.58
Promedio Interrupción Diarias (Hrs) 0.39 0.35 0.62 0.80 0.77 1.30 0.65 0.49 0.65 0.58 1.38 1.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Ciudad, Urb. Luz Marina, Bo. Pueblo Nuevo, Bo. Máximo Gomez, El Maní, La Montería, La Saona, Los Cajuilitos, El Fundo, Guazuma 2DA, Los Barracones, Villa Guera, La Montería, Pueblo Nuevo (parcial).