Circuito BANP102

Distribuidora EdeSur - Provincia Peravia


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación D A D D D D D A D D A D
Clientes 4793 4793 4759 4595 4409 4317 4268 4258 4342 4130 3789 3734
% Nivel Cobranza 0.00% 78.32% 81.48% 80.14% 87.89% 80.42% 82.32% 87.03% 75.03% 87.10% 74.49% 84.61%
% Nivel Pérdida 0.00% 77.32% 78.20% 78.14% 81.32% 77.73% 78.37% 80.82% 76.14% 82.88% 81.98% 85.43%
Energía Suministrada (GWh) 0 4.39 4.39 4 4.01 3.54 3.84 4.19 3.79 4.75 4.67 5.25
Energía Facturada (GWh) 0 1 0.96 0.88 0.75 0.79 0.83 0.8 0.91 0.81 0.84 0.76
Energía Cobrada (GWh) 0 0.78 0.78 0.7 0.66 0.63 0.68 0.7 0.68 0.71 0.63 0.65
% Servicio 97.28% 97.94% 97.31% 97.57% 94.27% 95.81% 91.69% 98.28% 96.67% 95.52% 92.80% 96.66%
% Sin Servicio 2.72% 2.06% 2.69% 2.43% 5.73% 4.19% 8.31% 1.72% 3.33% 4.48% 7.20% 3.34%
Interrupción Programada (Hrs) 13.00 14.00 15.00 12.00 10.00 28.00 46.00 11.00 15.00 9.00 12.00 12.00
Interrupción Ejecutada (Hrs) 19.82 15.05 19.65 17.71 41.83 30.58 60.63 12.58 24.33 32.70 52.54 24.41
Promedio Interrupción Diarias (Hrs) 0.65 0.49 0.65 0.58 1.38 1.01 1.99 0.41 0.80 1.08 1.73 0.80
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Ciudad, Urb. Luz Marina, Bo. Pueblo Nuevo, Bo. Máximo Gomez, El Maní, La Montería, La Saona, Los Cajuilitos, El Fundo, Guazuma 2DA, Los Barracones, Villa Guera, La Montería, Pueblo Nuevo (parcial).