Circuito BANP101

Distribuidora EdeSur - Provincia Peravia


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C A C C C C
Clientes 4000 4002 4002 4014 4023 4048 4042 4033 4036 3995 3981 3938
% Nivel Cobranza 0.00% 0.00% 92.71% 102.80% 90.99% 87.16% 104.81% 90.62% 95.99% 81.22% 108.43% 97.51%
% Nivel Pérdida 0.00% 0.00% 34.50% 32.08% 31.84% 37.51% 40.69% 31.44% 35.94% 33.73% 39.99% 27.28%
Energía Suministrada (GWh) 0 0 2.13 2.20 2.36 2.52 2.38 2.12 2.18 1.99 1.96 1.62
Energía Facturada (GWh) 0 0 1.39 1.49 1.61 1.57 1.41 1.45 1.4 1.32 1.18 1.18
Energía Cobrada (GWh) 0 0 1.29 1.53 1.47 1.37 1.48 1.32 1.34 1.07 1.28 1.15
% Servicio 98.90% 99.83% 99.13% 97.39% 98.34% 98.76% 99.06% 97.85% 98.24% 99.70% 98.50% 95.07%
% Sin Servicio 1.10% 0.17% 0.87% 2.61% 1.66% 1.24% 0.94% 2.15% 1.76% 0.30% 1.50% 4.93%
Interrupción Programada (Hrs) 4.00 3.00 0.00 12.00 3.00 4.00 3.00 13.00 8.00 0.00 6.00 25.00
Interrupción Ejecutada (Hrs) 7.90 1.29 6.37 19.07 12.14 9.07 6.83 15.68 12.85 2.22 10.92 35.96
Promedio Interrupción Diarias (Hrs) 0.26 0.04 0.21 0.63 0.40 0.30 0.22 0.52 0.42 0.07 0.36 1.18
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Bo. 30 de Mayo, Bo. Los Melones, las calles Santome, las Mercedes y Presidente Victoria del Bo. Santa Cruz , del Centro del Pueblo (parcial), las calles Máximo Gomez y 16 de Agosto, Brisa de Guazuma