Circuito BANP101
Distribuidora EdeSur - Provincia Peravia
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 | Abr24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | C | C | A | A | A | A | A | A | A | A | A | A |
Clientes | 3981 | 3938 | 3905 | 3874 | 3736 | 3778 | 3784 | 3762 | 3809 | 3774 | 3741 | 3724 |
% Nivel Cobranza | 108.43% | 97.51% | 100.33% | 117.39% | 83.39% | 107.34% | 83.83% | 102.45% | 112.53% | 90.29% | 88.48% | 106.15% |
% Nivel Pérdida | 39.99% | 27.28% | 21.18% | 38.64% | 33.58% | 39.34% | 36.23% | 47.18% | 39.38% | 34.86% | 40.39% | 37.02% |
Energía Suministrada (GWh) | 1.96 | 1.62 | 1.76 | 2.11 | 2.03 | 2.43 | 2.43 | 2.66 | 2.75 | 2.77 | 2.82 | 2.46 |
Energía Facturada (GWh) | 1.18 | 1.18 | 1.39 | 1.3 | 1.35 | 1.47 | 1.55 | 1.4 | 1.67 | 1.8 | 1.68 | 1.55 |
Energía Cobrada (GWh) | 1.28 | 1.15 | 1.39 | 1.52 | 1.12 | 1.58 | 1.3 | 1.44 | 1.88 | 1.63 | 1.49 | 1.64 |
% Servicio | 98.50% | 95.07% | 90.39% | 99.65% | 98.08% | 97.21% | 98.40% | 97.71% | 95.70% | 98.45% | 98.82% | 98.27% |
% Sin Servicio | 1.50% | 4.93% | 9.61% | 0.35% | 1.92% | 2.79% | 1.60% | 2.29% | 4.30% | 1.55% | 1.18% | 1.73% |
Interrupción Programada (Hrs) | 6.00 | 25.00 | 40.00 | 0.00 | 6.00 | 9.00 | 0.00 | 6.00 | 9.00 | 9.00 | 6.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 10.92 | 35.96 | 70.16 | 2.55 | 14.03 | 20.35 | 11.67 | 16.69 | 31.39 | 11.30 | 8.62 | 12.63 |
Promedio Interrupción Diarias (Hrs) | 0.36 | 1.18 | 2.31 | 0.08 | 0.46 | 0.67 | 0.38 | 0.55 | 1.03 | 0.37 | 0.28 | 0.42 |
Bo. 30 de Mayo, Bo. Los Melones, las calles Santome, las Mercedes y Presidente Victoria del Bo. Santa Cruz , del Centro del Pueblo (parcial), las calles Máximo Gomez y 16 de Agosto, Brisa de Guazuma