Circuito BANP101

Distribuidora EdeSur - Provincia Peravia


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación C A C C C C A A A A A A
Clientes 4033 4033 4036 3995 3981 3938 3905 3874 3736 3778 3784 3762
% Nivel Cobranza 0.00% 90.62% 95.99% 81.22% 108.43% 97.51% 100.33% 117.39% 83.39% 107.34% 83.83% 102.45%
% Nivel Pérdida 0.00% 31.44% 35.94% 33.73% 39.99% 27.28% 21.18% 38.64% 33.58% 39.34% 36.23% 47.18%
Energía Suministrada (GWh) 0 2.12 2.18 1.99 1.96 1.62 1.76 2.11 2.03 2.43 2.43 2.66
Energía Facturada (GWh) 0 1.45 1.4 1.32 1.18 1.18 1.39 1.3 1.35 1.47 1.55 1.4
Energía Cobrada (GWh) 0 1.32 1.34 1.07 1.28 1.15 1.39 1.52 1.12 1.58 1.3 1.44
% Servicio 99.06% 97.85% 98.24% 99.70% 98.50% 95.07% 90.39% 99.65% 98.08% 97.21% 98.40% 97.71%
% Sin Servicio 0.94% 2.15% 1.76% 0.30% 1.50% 4.93% 9.61% 0.35% 1.92% 2.79% 1.60% 2.29%
Interrupción Programada (Hrs) 3.00 13.00 8.00 0.00 6.00 25.00 40.00 0.00 6.00 9.00 0.00 6.00
Interrupción Ejecutada (Hrs) 6.83 15.68 12.85 2.22 10.92 35.96 70.16 2.55 14.03 20.35 11.67 16.69
Promedio Interrupción Diarias (Hrs) 0.22 0.52 0.42 0.07 0.36 1.18 2.31 0.08 0.46 0.67 0.38 0.55
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Bo. 30 de Mayo, Bo. Los Melones, las calles Santome, las Mercedes y Presidente Victoria del Bo. Santa Cruz , del Centro del Pueblo (parcial), las calles Máximo Gomez y 16 de Agosto, Brisa de Guazuma