Buscar Circuitos Glosario

Circuito BANP101

Distribuidora EdeSur - Provincia Peravia


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 3950 3950 3982 3996 3984 3982 4002 4002 4014 4023 4048 4042
% Nivel Cobranza 0.00% 91.83% 100.22% 111.60% 89.62% 103.53% 106.02% 92.71% 102.80% 90.99% 87.16% 104.81%
% Nivel Pérdida 0.00% 42.32% 38.89% 33.91% 26.97% 33.34% 32.83% 34.50% 32.08% 31.84% 37.51% 40.69%
Energía Suministrada (GWh) 0 2.27 1.96 1.90 1.72 1.99 2.12 2.13 2.20 2.36 2.52 2.38
Energía Facturada (GWh) 0 1.31 1.2 1.26 1.26 1.33 1.42 1.39 1.49 1.61 1.57 1.41
Energía Cobrada (GWh) 0 1.20 1.20 1.40 1.13 1.38 1.51 1.29 1.53 1.47 1.37 1.48
% Servicio 99.27% 97.79% 97.79% 99.87% 98.71% 98.90% 99.83% 99.13% 97.39% 98.34% 98.76% 99.06%
% Sin Servicio 0.73% 2.21% 2.21% 0.13% 1.29% 1.10% 0.17% 0.87% 2.61% 1.66% 1.24% 0.94%
Interrupción Programada (Hrs) 11.00 11.00 11.00 0.00 3.00 4.00 3.00 0.00 12.00 3.00 4.00 3.00
Interrupción Ejecutada (Hrs) 5.24 15.91 15.91 0.96 9.27 7.90 1.29 6.37 19.07 12.14 9.07 6.83
Promedio Interrupción Diarias (Hrs) 0.17 0.52 0.52 0.03 0.30 0.26 0.04 0.21 0.63 0.40 0.30 0.22
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito BANP101
Interrupciones Programadas 3.00
Interrupciones Ejecutadas 3.74
% Ejecución Operativa 124.67%
Detalle de Salidas - Circuito BANP101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Ejecutada 15:43:35 15:46:15 0.04 FALLA TRANSITORIA //
03/07/2026 Programada 09:00:00 12:00:00 3.00 DIVERSAS INTERVENCIONES EN LA RED //
03/07/2026 Ejecutada 09:02:28 12:44:44 3.70 DIVERSAS INTERVENCIONES EN LA RED //
Bo. 30 de Mayo, Bo. Los Melones, las calles Santome, las Mercedes y Presidente Victoria del Bo. Santa Cruz , del Centro del Pueblo (parcial), las calles Máximo Gomez y 16 de Agosto, Brisa de Guazuma