Circuito BANP101
Distribuidora EdeSur - Provincia Peravia
| Mes-Año | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | A | C | C | C | C | A | A |
| Clientes | 4014 | 4014 | 4023 | 4048 | 4042 | 4033 | 4036 | 3995 | 3981 | 3938 | 3905 | 3874 |
| % Nivel Cobranza | 0.00% | 102.80% | 90.99% | 87.16% | 104.81% | 90.62% | 95.99% | 81.22% | 108.43% | 97.51% | 100.33% | 117.39% |
| % Nivel Pérdida | 0.00% | 32.08% | 31.84% | 37.51% | 40.69% | 31.44% | 35.94% | 33.73% | 39.99% | 27.28% | 21.18% | 38.64% |
| Energía Suministrada (GWh) | 0 | 2.20 | 2.36 | 2.52 | 2.38 | 2.12 | 2.18 | 1.99 | 1.96 | 1.62 | 1.76 | 2.11 |
| Energía Facturada (GWh) | 0 | 1.49 | 1.61 | 1.57 | 1.41 | 1.45 | 1.4 | 1.32 | 1.18 | 1.18 | 1.39 | 1.3 |
| Energía Cobrada (GWh) | 0 | 1.53 | 1.47 | 1.37 | 1.48 | 1.32 | 1.34 | 1.07 | 1.28 | 1.15 | 1.39 | 1.52 |
| % Servicio | 99.13% | 97.39% | 98.34% | 98.76% | 99.06% | 97.85% | 98.24% | 99.70% | 98.50% | 95.07% | 90.39% | 99.65% |
| % Sin Servicio | 0.87% | 2.61% | 1.66% | 1.24% | 0.94% | 2.15% | 1.76% | 0.30% | 1.50% | 4.93% | 9.61% | 0.35% |
| Interrupción Programada (Hrs) | 0.00 | 12.00 | 3.00 | 4.00 | 3.00 | 13.00 | 8.00 | 0.00 | 6.00 | 25.00 | 40.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 6.37 | 19.07 | 12.14 | 9.07 | 6.83 | 15.68 | 12.85 | 2.22 | 10.92 | 35.96 | 70.16 | 2.55 |
| Promedio Interrupción Diarias (Hrs) | 0.21 | 0.63 | 0.40 | 0.30 | 0.22 | 0.52 | 0.42 | 0.07 | 0.36 | 1.18 | 2.31 | 0.08 |
Bo. 30 de Mayo, Bo. Los Melones, las calles Santome, las Mercedes y Presidente Victoria del Bo. Santa Cruz , del Centro del Pueblo (parcial), las calles Máximo Gomez y 16 de Agosto, Brisa de Guazuma