Circuito BANI403C
Distribuidora EdeSur - Provincia Peravia
Mes-Año | Abr18 | Mar18 | Feb18 | Ene18 | Dic17 | Nov17 | Oct17 | Sep17 | Ago17 | Jul17 | Jun17 | May17 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
Clientes | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 | 34 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 99.63% | 100.00% | 99.50% | 100.00% |
% Sin Servicio | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.37% | 0.00% | 0.50% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2.73 | 0.00 | 3.67 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.09 | 0.00 | 0.12 | 0.00 |
C/ Fabio Herrera de Boca Canasta (parcial), Los Almendros.