Circuito BANI103A
Distribuidora EdeSur - Provincia Peravia
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C | C | C | C | C | C | C |
| Clientes | 1605 | 1605 | 1609 | 1613 | 1635 | 1264 | 1260 | 1260 | 1264 | 1256 | 1274 | 1286 |
| % Nivel Cobranza | 0.00% | 86.16% | 86.04% | 92.71% | 84.51% | 101.52% | 118.91% | 103.94% | 96.88% | 94.56% | 93.11% | 97.66% |
| % Nivel Pérdida | 0.00% | 60.79% | 55.22% | 55.83% | 49.04% | 44.94% | 60.58% | 59.08% | 57.06% | 46.48% | 52.47% | 61.05% |
| Energía Suministrada (GWh) | 0 | 0.70 | 0.58 | 0.56 | 0.51 | 0.41 | 0.59 | 0.61 | 0.66 | 0.55 | 0.61 | 0.66 |
| Energía Facturada (GWh) | 0 | 0.27 | 0.26 | 0.25 | 0.26 | 0.23 | 0.23 | 0.25 | 0.28 | 0.29 | 0.29 | 0.26 |
| Energía Cobrada (GWh) | 0 | 0.24 | 0.22 | 0.23 | 0.22 | 0.23 | 0.28 | 0.26 | 0.27 | 0.28 | 0.27 | 0.25 |
| % Servicio | 96.45% | 97.86% | 97.86% | 98.34% | 97.64% | 97.24% | 98.45% | 98.99% | 98.02% | 98.58% | 98.19% | 97.94% |
| % Sin Servicio | 3.55% | 2.14% | 2.14% | 1.66% | 2.36% | 2.76% | 1.55% | 1.01% | 1.98% | 1.42% | 1.81% | 2.06% |
| Interrupción Programada (Hrs) | 6.00 | 11.00 | 11.00 | 12.00 | 10.00 | 10.00 | 6.00 | 6.00 | 10.00 | 6.00 | 4.00 | 8.00 |
| Interrupción Ejecutada (Hrs) | 25.54 | 15.41 | 15.41 | 11.92 | 16.99 | 19.85 | 11.54 | 7.37 | 14.42 | 10.36 | 13.21 | 15.05 |
| Promedio Interrupción Diarias (Hrs) | 0.84 | 0.51 | 0.51 | 0.39 | 0.56 | 0.65 | 0.38 | 0.24 | 0.47 | 0.34 | 0.43 | 0.49 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 06/07/2026 | Programada | 07:00:00 | 09:00:00 | 2.00 | EN MANTENIMIENTO // MANIOBRAS APERTURA/CIERRE (AVERIA) // MANIOBRAS APERTURA/CIERRE (AVERIA) |
| 06/07/2026 | Ejecutada | 10:01:13 | 11:16:12 | 4.22 | EN MANTENIMIENTO // MANIOBRAS APERTURA/CIERRE (AVERIA) // MANIOBRAS APERTURA/CIERRE (AVERIA) |
| 06/07/2026 | Ejecutada | 09:59:03 | 10:01:13 | 4.22 | EN MANTENIMIENTO // MANIOBRAS APERTURA/CIERRE (AVERIA) // MANIOBRAS APERTURA/CIERRE (AVERIA) |
| 06/07/2026 | Ejecutada | 07:03:04 | 09:59:03 | 4.22 | EN MANTENIMIENTO // MANIOBRAS APERTURA/CIERRE (AVERIA) // MANIOBRAS APERTURA/CIERRE (AVERIA) |
| 03/07/2026 | Programada | 11:00:00 | 13:00:00 | 2.00 | EN MANTENIMIENTO // |
| 03/07/2026 | Ejecutada | 11:00:41 | 14:04:30 | 3.06 | EN MANTENIMIENTO // |