Circuito BANI103
Distribuidora EdeSur - Provincia Peravia
| Mes-Año | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | A | B | C | C | C | A | A |
| Clientes | 5970 | 5970 | 5914 | 5898 | 5881 | 5853 | 5847 | 5829 | 5787 | 5746 | 5744 | 5691 |
| % Nivel Cobranza | 0.00% | 102.95% | 90.65% | 88.12% | 99.13% | 94.36% | 94.40% | 87.88% | 106.12% | 100.92% | 94.08% | 112.66% |
| % Nivel Pérdida | 0.00% | 33.31% | 37.49% | 45.94% | 46.20% | 39.02% | 33.51% | 38.47% | 45.64% | 35.48% | 36.74% | 44.36% |
| Energía Suministrada (GWh) | 0 | 2.33 | 2.69 | 2.98 | 2.69 | 2.28 | 2.04 | 2.07 | 2.04 | 1.73 | 1.99 | 2.08 |
| Energía Facturada (GWh) | 0 | 1.56 | 1.68 | 1.61 | 1.45 | 1.39 | 1.36 | 1.27 | 1.11 | 1.12 | 1.26 | 1.15 |
| Energía Cobrada (GWh) | 0 | 1.60 | 1.52 | 1.42 | 1.43 | 1.31 | 1.28 | 1.12 | 1.18 | 1.13 | 1.18 | 1.3 |
| % Servicio | 97.63% | 96.85% | 97.13% | 97.47% | 98.65% | 97.10% | 98.51% | 97.66% | 97.59% | 96.44% | 98.22% | 98.00% |
| % Sin Servicio | 2.37% | 3.15% | 2.87% | 2.53% | 1.35% | 2.90% | 1.49% | 2.34% | 2.41% | 3.56% | 1.78% | 2.00% |
| Interrupción Programada (Hrs) | 9.00 | 12.00 | 12.00 | 6.00 | 9.00 | 17.00 | 13.00 | 15.00 | 13.00 | 22.00 | 4.00 | 11.00 |
| Interrupción Ejecutada (Hrs) | 17.31 | 23.02 | 20.98 | 18.45 | 9.88 | 21.19 | 10.85 | 17.07 | 17.61 | 25.98 | 13.02 | 14.64 |
| Promedio Interrupción Diarias (Hrs) | 0.57 | 0.76 | 0.69 | 0.61 | 0.32 | 0.70 | 0.36 | 0.56 | 0.58 | 0.85 | 0.43 | 0.48 |
Centro del Pueblo Baní (parcial), Los Robles, Santa Rosa, Brisas del Canal, Urb. BHD, Valera Guzmán, Palo Alto, Boca Canasta, Los Almendros, Corbanal.