Circuito AZUA101A

Distribuidora EdeSur - Provincia Azua


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C A C C C C
Clientes 1830 1835 1835 1840 1844 1824 1828 1833 1834 1837 1838 1844
% Nivel Cobranza 0.00% 0.00% 56.80% 56.97% 56.91% 58.56% 60.89% 59.83% 60.02% 54.89% 58.20% 53.78%
% Nivel Pérdida 0.00% 0.00% 69.84% 69.67% 71.67% 73.60% 73.16% 72.18% 71.67% 70.50% 72.93% 67.29%
Energía Suministrada (GWh) 0 0 1.07 1.05 1.13 1.22 1.2 1.16 1.15 1.1 1.08 0.93
Energía Facturada (GWh) 0 0 0.32 0.32 0.32 0.32 0.32 0.32 0.33 0.32 0.29 0.3
Energía Cobrada (GWh) 0 0 0.18 0.18 0.18 0.19 0.2 0.19 0.2 0.18 0.17 0.16
% Servicio 97.04% 97.35% 96.20% 94.92% 97.60% 96.49% 96.74% 97.69% 99.11% 99.80% 99.43% 99.70%
% Sin Servicio 2.96% 2.65% 3.80% 5.08% 2.40% 3.51% 3.26% 2.31% 0.89% 0.20% 0.57% 0.30%
Interrupción Programada (Hrs) 12.00 9.00 9.00 19.00 4.00 12.00 14.00 10.00 6.00 8.00 0.00 0.00
Interrupción Ejecutada (Hrs) 21.28 19.71 27.76 37.07 17.55 25.60 23.81 16.83 6.52 1.46 4.16 2.22
Promedio Interrupción Diarias (Hrs) 0.70 0.65 0.91 1.22 0.58 0.84 0.78 0.55 0.21 0.05 0.14 0.07
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

El Barro, Bo. El Higuero, Bo. Camboya, Bo. Los Jobos, Las Lomas, Peralta, Majagual.