Circuito AZUA101

Distribuidora EdeSur - Provincia Azua


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación C C C C C A C C C C A A
Clientes 7446 7446 7409 7414 7427 7425 7418 7405 7405 7419 7439 7424
% Nivel Cobranza 0.00% 95.17% 92.91% 89.07% 99.93% 84.90% 98.35% 81.11% 91.79% 89.79% 100.92% 91.51%
% Nivel Pérdida 0.00% 41.30% 42.43% 43.74% 48.93% 40.97% 46.21% 41.23% 48.99% 40.67% 36.67% 44.84%
Energía Suministrada (GWh) 0 4.91 4.98 5.36 5.59 5.15 5.05 4.7 4.63 3.9 4.11 4.54
Energía Facturada (GWh) 0 2.88 2.87 3.02 2.86 3.04 2.71 2.76 2.36 2.32 2.6 2.51
Energía Cobrada (GWh) 0 2.74 2.67 2.69 2.85 2.58 2.67 2.24 2.17 2.08 2.63 2.29
% Servicio 97.35% 97.43% 96.30% 97.79% 97.63% 97.86% 98.36% 98.85% 96.82% 95.20% 92.47% 98.89%
% Sin Servicio 2.65% 2.57% 3.70% 2.21% 2.37% 2.14% 1.64% 1.15% 3.18% 4.80% 7.53% 1.11%
Interrupción Programada (Hrs) 4.00 4.00 5.00 0.00 7.00 10.00 0.00 3.00 8.00 22.00 39.00 3.00
Interrupción Ejecutada (Hrs) 19.34 18.78 26.99 16.17 17.27 15.61 11.95 8.40 23.21 35.04 54.95 8.12
Promedio Interrupción Diarias (Hrs) 0.64 0.62 0.89 0.53 0.57 0.51 0.39 0.28 0.76 1.15 1.81 0.27
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro del Pueblo de Azua, Bo. Simón Striddels, Bo. La Cuchilla, Bo. La Placeta, Bo. El Hoyo, Peralta, Camboya, Bo. La Bombita, Bo. Los Parceleros, Bo. Juan Pablo Duarte, El Barro, Peralta: Bo. El Higuero, Los Jobos, Barrio Resoly, Las Yayitas, sistemas de bombea de INAPA Azua.