Circuito AZUA101

Distribuidora EdeSur - Provincia Azua


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C A A A A A A A A A A
Clientes 7405 7419 7439 7424 7457 7532 7419 7412 7401 7398 7433 7453
% Nivel Cobranza 91.79% 89.79% 100.92% 91.51% 94.66% 96.45% 84.55% 90.51% 95.82% 91.45% 91.70% 84.16%
% Nivel Pérdida 48.99% 40.67% 36.67% 44.84% 35.90% 45.25% 43.54% 47.33% 45.75% 43.40% 47.39% 41.41%
Energía Suministrada (GWh) 4.63 3.9 4.11 4.54 4.19 5.24 5.15 5.23 4.81 4.65 4.92 4.46
Energía Facturada (GWh) 2.36 2.32 2.6 2.51 2.69 2.87 2.91 2.76 2.61 2.63 2.59 2.61
Energía Cobrada (GWh) 2.17 2.08 2.63 2.29 2.54 2.77 2.46 2.49 2.5 2.41 2.37 2.2
% Servicio 96.82% 95.20% 92.47% 98.89% 99.16% 97.98% 97.77% 98.34% 94.58% 98.75% 99.57% 99.15%
% Sin Servicio 3.18% 4.80% 7.53% 1.11% 0.84% 2.02% 2.23% 1.66% 5.42% 1.25% 0.43% 0.85%
Interrupción Programada (Hrs) 8.00 22.00 39.00 3.00 0.00 0.00 7.00 0.00 5.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 23.21 35.04 54.95 8.12 6.11 14.75 16.27 12.12 39.58 9.11 3.15 6.19
Promedio Interrupción Diarias (Hrs) 0.76 1.15 1.81 0.27 0.20 0.48 0.53 0.40 1.30 0.30 0.10 0.20
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro del Pueblo de Azua, Bo. Simón Striddels, Bo. La Cuchilla, Bo. La Placeta, Bo. El Hoyo, Peralta, Camboya, Bo. La Bombita, Bo. Los Parceleros, Bo. Juan Pablo Duarte, El Barro, Peralta: Bo. El Higuero, Los Jobos, Barrio Resoly, Las Yayitas, sistemas de bombea de INAPA Azua.