Circuito AZUA101

Distribuidora EdeSur - Provincia Azua


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C A C C C C A A A A
Clientes 7414 7414 7427 7425 7418 7405 7405 7419 7439 7424 7457 7532
% Nivel Cobranza 0.00% 89.07% 99.93% 84.90% 98.35% 81.11% 91.79% 89.79% 100.92% 91.51% 94.66% 96.45%
% Nivel Pérdida 0.00% 43.74% 48.93% 40.97% 46.21% 41.23% 48.99% 40.67% 36.67% 44.84% 35.90% 45.25%
Energía Suministrada (GWh) 0 5.36 5.59 5.15 5.05 4.7 4.63 3.9 4.11 4.54 4.19 5.24
Energía Facturada (GWh) 0 3.02 2.86 3.04 2.71 2.76 2.36 2.32 2.6 2.51 2.69 2.87
Energía Cobrada (GWh) 0 2.69 2.85 2.58 2.67 2.24 2.17 2.08 2.63 2.29 2.54 2.77
% Servicio 96.30% 97.79% 97.63% 97.86% 98.36% 98.85% 96.82% 95.20% 92.47% 98.89% 99.16% 97.98%
% Sin Servicio 3.70% 2.21% 2.37% 2.14% 1.64% 1.15% 3.18% 4.80% 7.53% 1.11% 0.84% 2.02%
Interrupción Programada (Hrs) 5.00 0.00 7.00 10.00 0.00 3.00 8.00 22.00 39.00 3.00 0.00 0.00
Interrupción Ejecutada (Hrs) 26.99 16.17 17.27 15.61 11.95 8.40 23.21 35.04 54.95 8.12 6.11 14.75
Promedio Interrupción Diarias (Hrs) 0.89 0.53 0.57 0.51 0.39 0.28 0.76 1.15 1.81 0.27 0.20 0.48
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro del Pueblo de Azua, Bo. Simón Striddels, Bo. La Cuchilla, Bo. La Placeta, Bo. El Hoyo, Peralta, Camboya, Bo. La Bombita, Bo. Los Parceleros, Bo. Juan Pablo Duarte, El Barro, Peralta: Bo. El Higuero, Los Jobos, Barrio Resoly, Las Yayitas, sistemas de bombea de INAPA Azua.