Buscar Circuitos Glosario

Circuito ATPQUI

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación A A A A A A A A A A A A
Clientes 0 0 0 7 7 7 7 7 7 7 7 7
% Nivel Cobranza 36.29% 159.36% 37.33% 100.00% 100.09% 100.04% 99.97% 100.02% 99.96% 99.98% 99.97% 100.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% -73.56% -25.02% 9.73% 11.72% -13.38% 9.91% -20.07% 17.23%
Energía Suministrada (GWh) 0 0 0 0 0.27 0.46 0.57 0.51 0.45 0.51 0.45 0.54
Energía Facturada (GWh) 0 0 0 0.27 0.46 0.58 0.52 0.45 0.51 0.46 0.55 0.45
Energía Cobrada (GWh) 0 0 0 0.27 0.46 0.58 0.52 0.45 0.51 0.46 0.54 0.45
% Servicio 0.00% 0.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 99.98% 99.44% 100.00%
% Sin Servicio 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.56% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 2.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.16 4.10 0.00
Promedio Interrupción Diarias (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.13 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito ATPQUI
Interrupciones Programadas 8.00
Interrupciones Ejecutadas 0.16
% Ejecución Operativa 2.00%
Detalle de Salidas - Circuito ATPQUI
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
01/08/2024 Programada 08:00:00 16:00:00 8.00
29/07/2024 Ejecutada 17:49:52 17:59:29 0.16 DISPARO LÍNEA 69 KV //
Petroquímica, Polyplas y Termopac.