Buscar Circuitos Glosario

Circuito ATPARA

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 104.14% 0.00% 100.00% 5370.49% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
% Nivel Pérdida 0.00% 85.60% 95.86% -6010.00% 98.34% -5167.90% -130.65% -11.16% 11.61% -0.99% 2.06% 55.69%
Energía Suministrada (GWh) 0 3.36 0.48 0.02 1.23 0.02 1.07 2.47 2.75 2.43 2.45 2.4
Energía Facturada (GWh) 0 0.48 0.02 1.23 0.02 1.07 2.47 2.75 2.43 2.45 2.4 1.07
Energía Cobrada (GWh) 0 0.50 0 1.23 1.09 0 2.47 2.75 2.43 2.45 2.4 1.07
% Servicio 100.00% 100.00% 100.00% 100.00% 99.09% 100.00% 100.00% 99.42% 100.00% 100.00% 100.00% 100.00%
% Sin Servicio 0.00% 0.00% 0.00% 0.00% 0.91% 0.00% 0.00% 0.58% 0.00% 0.00% 0.00% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.00 0.00 0.00 6.55 0.00 0.00 4.27 0.00 0.00 0.00 0.00
Promedio Interrupción Diarias (Hrs) 0.00 0.00 0.00 0.00 0.22 0.00 0.00 0.14 0.00 0.00 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito ATPARA
Interrupciones Programadas 0
Interrupciones Ejecutadas 13.10
% Ejecución Operativa 0%
Detalle de Salidas - Circuito ATPARA
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
23/02/2026 Ejecutada 16:39:03 18:53:00 6.55 BLACK OUT-TRANSMISIÓN // BLACK OUT-TRANSMISIÓN //
23/02/2026 Ejecutada 10:53:18 15:12:30 6.55 BLACK OUT-TRANSMISIÓN // BLACK OUT-TRANSMISIÓN //
T03 S/E PARAÍSO (METRO SANTO DOMINGO)