Buscar Circuitos Glosario

Circuito ATC16A

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 2
% Nivel Cobranza 0.00% 91.95% 91.95% 88.17% 93.55% 88.31% 108.09% 109.07% 100.50% 120.32% 108.56% 107.14%
% Nivel Pérdida 0.00% 11.51% 11.51% 8.05% 11.83% 6.45% 11.69% -8.09% -9.07% -0.50% -20.32% -8.55%
Energía Suministrada (GWh) 0 0.52 0.52 0.46 0.43 0.38 0.35 0.31 0.34 0.37 0.37 0.44
Energía Facturada (GWh) 0 0.46 0.46 0.43 0.38 0.35 0.31 0.34 0.37 0.37 0.44 0.48
Energía Cobrada (GWh) 0 0.43 0.43 0.38 0.35 0.31 0.34 0.37 0.37 0.44 0.48 0.52
% Servicio 99.86% 98.91% 98.32% 99.10% 98.90% 98.90% 100.00% 99.02% 99.68% 99.26% 98.34% 100.00%
% Sin Servicio 0.14% 1.09% 1.68% 0.90% 1.10% 1.10% 0.00% 0.98% 0.32% 0.74% 1.66% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 2.00
Interrupción Ejecutada (Hrs) 0.98 7.87 12.10 6.47 7.92 7.92 0.00 7.08 2.32 5.47 12.10 0.00
Promedio Interrupción Diarias (Hrs) 0.03 0.26 0.40 0.21 0.26 0.26 0.00 0.23 0.08 0.18 0.40 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito ATC16A
Interrupciones Programadas 4.00
Interrupciones Ejecutadas 5.04
% Ejecución Operativa 126.00%
Detalle de Salidas - Circuito ATC16A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
13/10/2026 Programada 09:00:00 10:00:00 1.00 APERTURA SS/EE MANTENIMIENTO //
13/10/2026 Ejecutada 09:04:14 09:58:15 0.90 APERTURA SS/EE MANTENIMIENTO //
08/10/2026 Ejecutada 07:40:10 08:08:55 2.07 DISPARO LÍNEA 69 KV // DISPARO LÍNEA 69 KV //
08/10/2026 Ejecutada 06:03:34 07:39:07 2.07 DISPARO LÍNEA 69 KV // DISPARO LÍNEA 69 KV //
06/10/2026 Programada 09:00:00 12:00:00 3.00
Campamento 16 de Agosto.