Circuito ATC16A

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 2 1 1
% Nivel Cobranza 0.00% 88.17% 93.55% 88.31% 108.09% 109.07% 100.50% 120.32% 108.56% 107.14% 94.13% 92.10%
% Nivel Pérdida 0.00% 8.05% 11.83% 6.45% 11.69% -8.09% -9.07% -0.50% -20.32% -8.55% -7.13% 5.87%
Energía Suministrada (GWh) 0 0.46 0.43 0.38 0.35 0.31 0.34 0.37 0.37 0.44 0.48 0.51
Energía Facturada (GWh) 0 0.43 0.38 0.35 0.31 0.34 0.37 0.37 0.44 0.48 0.51 0.48
Energía Cobrada (GWh) 0 0.38 0.35 0.31 0.34 0.37 0.37 0.44 0.48 0.52 0.48 0.45
% Servicio 98.32% 99.10% 98.90% 98.90% 100.00% 99.02% 99.68% 99.26% 98.34% 100.00% 99.94% 99.07%
% Sin Servicio 1.68% 0.90% 1.10% 1.10% 0.00% 0.98% 0.32% 0.74% 1.66% 0.00% 0.06% 0.93%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 2.00 0.00 0.00
Interrupción Ejecutada (Hrs) 12.10 6.47 7.92 7.92 0.00 7.08 2.32 5.47 12.10 0.00 0.42 6.76
Promedio Interrupción Diarias (Hrs) 0.40 0.21 0.26 0.26 0.00 0.23 0.08 0.18 0.40 0.00 0.01 0.22
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito ATC16A
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.98
% Ejecución Operativa 0%
Detalle de Salidas - Circuito ATC16A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
13/08/2026 Ejecutada 10:48:09 11:16:45 0.48 CORRECTIVO EN POSTE //
10/08/2026 Ejecutada 17:25:03 17:27:03 0.25 FALLA TRANSITORIA // FALLA TRANSITORIA //
10/08/2026 Ejecutada 17:09:30 17:22:20 0.25 FALLA TRANSITORIA // FALLA TRANSITORIA //
Campamento 16 de Agosto.