Circuito AHON102C
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Sep19 | Ago19 | Jul19 | Jun19 | May19 | Abr19 | Mar19 | Feb19 | Ene19 | Dic18 | Nov18 | Oct18 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
Clientes | 66 | 66 | 66 | 66 | 66 | 66 | 66 | 66 | 66 | 66 | 66 | 66 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 100.00% | 100.00% | 100.00% | 100.00% | 99.99% | 100.00% | 100.00% | 100.00% | 100.00% | 99.97% | 100.00% | 100.00% |
% Sin Servicio | 0.00% | 0.00% | 0.00% | 0.00% | 0.01% | 0.00% | 0.00% | 0.00% | 0.00% | 0.03% | 0.00% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.07 | 0.00 | 0.00 | 0.00 | 0.00 | 0.23 | 0.00 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.01 | 0.00 | 0.00 |
Callejón San Rafael, Callejón Orlando, Peatonal San Rafael, La Cañada, Paseo de los Reyes Católicos (parcial), Bo. Puerto Rico.