Circuito AHON102A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación B B B A B B B B A A A A
Clientes 550 550 550 543 544 543 539 533 530 528 527 525
% Nivel Cobranza 0.00% 90.64% 111.32% 92.70% 97.35% 91.31% 91.51% 96.09% 107.95% 104.02% 118.04% 97.29%
% Nivel Pérdida 0.00% 76.80% 76.62% 75.65% 78.06% 74.53% 76.49% 70.03% 76.32% 76.57% 74.79% 67.76%
Energía Suministrada (GWh) 0 1.05 0.94 0.87 0.9 0.78 0.81 0.6 0.73 0.77 0.74 0.72
Energía Facturada (GWh) 0 0.24 0.22 0.21 0.2 0.2 0.19 0.18 0.17 0.18 0.19 0.23
Energía Cobrada (GWh) 0 0.22 0.25 0.2 0.19 0.18 0.17 0.17 0.19 0.19 0.22 0.23
% Servicio 99.47% 99.12% 99.86% 99.17% 99.17% 99.27% 99.18% 98.52% 99.92% 99.75% 99.75% 99.85%
% Sin Servicio 0.53% 0.88% 0.14% 0.83% 0.83% 0.73% 0.82% 1.48% 0.08% 0.25% 0.25% 0.15%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 3.86 6.44 0.99 6.06 6.06 5.31 6.00 10.79 0.60 1.84 1.81 1.10
Promedio Interrupción Diarias (Hrs) 0.13 0.21 0.03 0.20 0.20 0.17 0.20 0.35 0.02 0.06 0.06 0.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

La Puya de Arroyo Hondo