Circuito AHON102A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 3208 3208 3255 3247 3304 570 568 568 566 551 550 550
% Nivel Cobranza 0.00% 35.66% 38.61% 41.58% 36.64% 125.01% 93.14% 105.33% 105.86% 89.23% 90.64% 111.32%
% Nivel Pérdida 0.00% 32.06% 35.04% 31.00% 30.03% 74.79% 73.38% 75.08% 73.34% 72.95% 76.80% 76.62%
Energía Suministrada (GWh) 0 0.78 0.76 0.66 0.67 0.73 0.77 0.80 0.90 0.97 1.05 0.94
Energía Facturada (GWh) 0 0.53 0.50 0.45 0.47 0.18 0.20 0.2 0.24 0.26 0.24 0.22
Energía Cobrada (GWh) 0 0.19 0.19 0.19 0.17 0.23 0.19 0.21 0.25 0.23 0.22 0.25
% Servicio 99.85% 99.37% 99.37% 97.75% 98.20% 99.90% 99.69% 97.58% 98.07% 99.47% 99.12% 99.86%
% Sin Servicio 0.15% 0.63% 0.63% 2.25% 1.80% 0.10% 0.31% 2.42% 1.93% 0.53% 0.88% 0.14%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.08 4.55 4.55 16.21 12.97 0.70 2.29 17.68 14.07 3.86 6.44 0.99
Promedio Interrupción Diarias (Hrs) 0.04 0.15 0.15 0.53 0.43 0.02 0.08 0.58 0.46 0.13 0.21 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito AHON102A
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.39
% Ejecución Operativa 0%
Detalle de Salidas - Circuito AHON102A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Ejecutada 07:33:14 07:52:35 0.32 ACTUACIÓN BAJA FRECUENCIA (81) //
05/07/2026 Ejecutada 16:01:02 16:05:05 0.07 FALLA TRANSITORIA //