Circuito AHON102A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación B B B B B B B B B A B B
Clientes 3304 3304 570 568 568 566 551 550 550 543 544 543
% Nivel Cobranza 0.00% 36.64% 125.01% 93.14% 105.33% 105.86% 89.23% 90.64% 111.32% 92.70% 97.35% 91.31%
% Nivel Pérdida 0.00% 30.03% 74.79% 73.38% 75.08% 73.34% 72.95% 76.80% 76.62% 75.65% 78.06% 74.53%
Energía Suministrada (GWh) 0 0.67 0.73 0.77 0.80 0.90 0.97 1.05 0.94 0.87 0.9 0.78
Energía Facturada (GWh) 0 0.47 0.18 0.20 0.2 0.24 0.26 0.24 0.22 0.21 0.2 0.2
Energía Cobrada (GWh) 0 0.17 0.23 0.19 0.21 0.25 0.23 0.22 0.25 0.2 0.19 0.18
% Servicio 97.75% 98.20% 99.90% 99.69% 97.58% 98.07% 99.47% 99.12% 99.86% 99.17% 99.17% 99.27%
% Sin Servicio 2.25% 1.80% 0.10% 0.31% 2.42% 1.93% 0.53% 0.88% 0.14% 0.83% 0.83% 0.73%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 16.21 12.97 0.70 2.29 17.68 14.07 3.86 6.44 0.99 6.06 6.06 5.31
Promedio Interrupción Diarias (Hrs) 0.53 0.43 0.02 0.08 0.58 0.46 0.13 0.21 0.03 0.20 0.20 0.17
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

La Puya de Arroyo Hondo