Buscar Circuitos Glosario

Circuito AHMI401

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 116.00% 92.55% 113.21% 99.03% 95.41% 94.88% 91.67% 113.77% 106.69% 97.46% 85.09%
% Nivel Pérdida 0.00% 20.59% -16.00% 7.45% -13.21% 0.97% 4.59% 5.12% 8.33% -13.77% -6.69% 2.54%
Energía Suministrada (GWh) 0 0.68 0.54 0.62 0.58 0.65 0.65 0.62 0.58 0.54 0.61 0.65
Energía Facturada (GWh) 0 0.54 0.62 0.58 0.65 0.65 0.62 0.58 0.54 0.61 0.65 0.63
Energía Cobrada (GWh) 0 0.62 0.58 0.65 0.65 0.62 0.58 0.54 0.61 0.65 0.63 0.54
% Servicio 98.94% 100.00% 99.55% 99.79% 99.59% 99.62% 99.97% 99.36% 99.49% 99.96% 99.66% 99.66%
% Sin Servicio 1.06% 0.00% 0.45% 0.21% 0.41% 0.38% 0.03% 0.64% 0.51% 0.04% 0.34% 0.34%
Interrupción Programada (Hrs) 6.00 0.00 0.00 6.00 2.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00
Interrupción Ejecutada (Hrs) 7.62 0.00 3.21 1.50 2.95 2.77 0.24 4.70 3.75 0.30 2.46 2.45
Promedio Interrupción Diarias (Hrs) 0.25 0.00 0.11 0.05 0.10 0.09 0.01 0.15 0.12 0.01 0.08 0.08
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito AHMI401
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.33
% Ejecución Operativa 0%
Detalle de Salidas - Circuito AHMI401
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 15:07:20 15:16:23 0.15 FALLAS ETED, DISPARO DE LINEA TRANSMISION
02/07/2026 Ejecutada 15:33:40 15:44:14 0.18 FALLAS ETED, DISPARO DE LINEA TRANSMISION
Acueducto Hermanas Mirabal.