Circuito ABAP101

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C C C C C C
Clientes 7829 7829 7803 7773 7727 7695 7643 7671 7632 7629 7628 7647
% Nivel Cobranza 0.00% 104.90% 94.87% 104.18% 82.18% 88.60% 99.57% 80.57% 97.46% 87.38% 106.33% 97.62%
% Nivel Pérdida 0.00% 25.86% 18.35% 20.66% 6.60% 21.08% 28.41% 21.87% 33.38% 21.81% 34.22% 15.40%
Energía Suministrada (GWh) 0 2.27 2.31 2.53 2.39 2.47 2.51 2.35 2.37 2.03 2.09 1.71
Energía Facturada (GWh) 0 1.68 1.89 2.01 2.23 1.95 1.8 1.84 1.58 1.59 1.38 1.45
Energía Cobrada (GWh) 0 1.76 1.79 2.09 1.83 1.73 1.79 1.48 1.54 1.39 1.46 1.42
% Servicio 98.91% 99.36% 98.15% 98.61% 97.91% 96.82% 97.57% 98.19% 99.66% 99.71% 97.82% 97.56%
% Sin Servicio 1.09% 0.64% 1.85% 1.39% 2.09% 3.18% 2.43% 1.81% 0.34% 0.29% 2.18% 2.44%
Interrupción Programada (Hrs) 6.00 0.00 0.00 11.00 5.00 5.00 9.00 0.00 0.00 0.00 0.00 18.00
Interrupción Ejecutada (Hrs) 7.88 4.75 13.49 10.12 15.26 23.18 17.73 13.20 2.48 2.14 15.93 17.78
Promedio Interrupción Diarias (Hrs) 0.26 0.16 0.44 0.33 0.50 0.76 0.58 0.43 0.08 0.07 0.52 0.58
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Villa Riva, Barrio David, Cruce de Abanico, Buenos Aires, Cuidad Nueva, Urb. Rodriguez, Chiringo, Los Rieles, San Antonio, el Manguito, Urb Abreu, Barrio David, CT-168114 CT-168115