Circuito ABAP101

Distribuidora EdeNorte - Provincia Duarte


Mes-Año May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24
Clasificación C C C C B B B B B B B A
Clientes 7629 7629 7628 7647 3838 7561 7561 7558 7430 7494 7460 0
% Nivel Cobranza 0.00% 87.38% 106.33% 97.62% 95.34% 98.78% 3.38% 96.14% 84.75% 88.23% 93.34% 85.20%
% Nivel Pérdida 0.00% 21.81% 34.22% 15.40% 9.64% 37.06% 30.52% 41.50% 40.72% 44.41% 52.11% 43.88%
Energía Suministrada (GWh) 0 2.03 2.09 1.71 1.79 2.53 2.6 3.32 3.23 3.54 3.74 3.13
Energía Facturada (GWh) 0 1.59 1.38 1.45 1.62 1.59 1.81 1.95 1.92 1.97 1.79 1.75
Energía Cobrada (GWh) 0 1.39 1.46 1.42 1.54 1.57 0.06 1.87 1.62 1.74 1.67 1.49
% Servicio 99.66% 99.71% 97.82% 97.56% 92.58% 99.82% 97.97% 97.84% 97.64% 99.25% 97.13% 0.00%
% Sin Servicio 0.34% 0.29% 2.18% 2.44% 7.42% 0.18% 2.03% 2.16% 2.36% 0.75% 2.87% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 18.00 52.00 0.00 8.00 0.00 10.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 2.48 2.14 15.93 17.78 54.19 1.30 14.79 15.74 17.21 5.45 20.95 0.00
Promedio Interrupción Diarias (Hrs) 0.08 0.07 0.52 0.58 1.78 0.04 0.49 0.52 0.57 0.18 0.69 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Villa Riva, Barrio David, Cruce de Abanico, Buenos Aires, Cuidad Nueva, Urb. Rodriguez, Chiringo, Los Rieles, San Antonio, el Manguito, Urb Abreu, Barrio David, CT-168114 CT-168115