Buscar Circuitos Glosario

Circuito ABAC01

Distribuidora EdeEste - Provincia San Pedro De Macoris


Mes-Año Jul12 Jun12 May12 Abr12 Mar12 Feb12 Ene12 Dic11 Dic11 Nov11 Nov11 Oct11
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Energía Suministrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Facturada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
% Servicio 99.58% 97.24% 98.74% 97.47% 99.12% 99.21% 100.00% 98.92% 98.92% 99.34% 99.34% 99.49%
% Sin Servicio 0.42% 2.76% 1.26% 2.53% 0.88% 0.79% 0.00% 1.08% 1.08% 0.66% 0.66% 0.51%
Interrupción Programada (Hrs) 1.00 5.00 16.00 24.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 9.00
Interrupción Ejecutada (Hrs) 3.08 20.13 9.20 18.50 6.43 5.80 0.00 7.90 7.90 4.83 4.83 3.75
Promedio Interrupción Diarias (Hrs) 0.10 0.66 0.30 0.61 0.21 0.19 0.00 0.26 0.26 0.16 0.16 0.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito ABAC01
Interrupciones Programadas 1.00
Interrupciones Ejecutadas 6.16
% Ejecución Operativa 616.00%
Detalle de Salidas - Circuito ABAC01
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/07/2012 Ejecutada 19:44:00 21:26:00 3.08 LLUVIAS // REPOSICION DE JUMPER
19/07/2012 Ejecutada 15:54:00 17:17:00 3.08 LLUVIAS // REPOSICION DE JUMPER
17/07/2012 Programada 10:20:00 11:20:00 1.00
ABACA